Changes

m
no edit summary
Line 4: Line 4:  
<br>
 
<br>
 
{{Tree chart/start|align=center|summary= Combined RobotX Team}}
 
{{Tree chart/start|align=center|summary= Combined RobotX Team}}
{{Tree chart| | | | | | | |SI| | | | |SI=[[File:Male-2.jpg|center|124px]]<big>'''Marine Science'''<br>[[Subsystems Integrator]]</big>}}
+
{{Tree chart| | | | | | | |SI| | | | |SI=[[File:Male-2.jpg|center|124px]]<big>'''[[Marine Science & Technology | Marine Science]]'''<br>[[Subsystems Integrator]]</big>}}
 
{{Tree chart/end}}
 
{{Tree chart/end}}
 +
 +
==Core Competency==
 +
*Create Direction, Alignment and Commitment
 +
*Critical thinking and problem solving
 +
*Excels at decision-making
 +
*Primary consultant to Leadership and Planning
 +
*Recommends Conflict resolution
 +
*Engages in negotiation
 +
*High Degree of Adaptability
 +
*Stress Tolerant
    
==Goals==
 
==Goals==
 
===Integration Design, Build, and Test Plan===
 
===Integration Design, Build, and Test Plan===
*The Project Management(PM) and Systems integrator are responsible for planning, managing, and executing the Integration process.  
+
*The Project Management(PM) and Systems integrator (SI) are responsible for planning, managing, and executing the Integration process.  
 
*Projects that develop an integration plan have a high degree of success.
 
*Projects that develop an integration plan have a high degree of success.
 
*The plan defines the stages of integration, during which system elements are successively integrated to form higher level elements, and eventually the finished RobotX platform.
 
*The plan defines the stages of integration, during which system elements are successively integrated to form higher level elements, and eventually the finished RobotX platform.
 
*The integration plan includes descriptions of the required teams, test standards, testing methods, and integration schedule.
 
*The integration plan includes descriptions of the required teams, test standards, testing methods, and integration schedule.
 +
 +
==Technical Assessment responsibilities==
 +
*Establish event-driven technical planning
 +
*Identify Test measures and Metrics assessing design success
 +
*Identify performance measures and Metrics assessing technical progress
 +
*Determine risk and develop mitigation strategies 
 +
*Propose changes in the technical approach to address risk mitigation
 +
*Continually measure technical readiness of the RobotX platform
    
====Integrated Test Plan====
 
====Integrated Test Plan====
 
*includes design baseline evaluation
 
*includes design baseline evaluation
*# critical design parameters
+
*# identifying critical design parameters
*# performance threshholds
+
*# setting performance threshholds
 
*individual Subsystems test plans
 
*individual Subsystems test plans
*# suitability tests
+
*# interface tests
 +
*# functional tests
 
*# effectiveness tests
 
*# effectiveness tests
 
*platform performance test plan
 
*platform performance test plan
 
*# MOE (measures of effectiveness)
 
*# MOE (measures of effectiveness)
*#* maximum operational time
+
*#* maximum time on range without operation intervention
*#* operational goal accomplishment
+
*#* hardware operational goal accomplishment
*# MOS (measures of suitability)
+
*#* AI operational goal accomplishment
*#*subsystem Interoperability
+
*# MOF (measures of functionality)
*#*mean time between operational failure
+
*#*subsystems Interoperability
 
+
*#*mean time between Interoperability failure
==Core Competency==
  −
*Create Direction, Alignment and Commitment
  −
*Critical thinking and problem solving
  −
*Excels at decision-making
  −
*Primary Leadership and Planning (leader of leaders)
  −
*Leads Conflict resolution
  −
*High Degree of Adaptability
  −
*Stress Tolerant
  −
*Engages in contract negotiation
  −
 
  −
==Technical Assessment responsibilities==
  −
*Establish event-driven technical planning
  −
*Identify measures and metrics
  −
*Identify performance measures assessing technical progress
  −
*Determine risk and develop mitigation strategies 
  −
*Propose changes in the technical approach to address risk mitigation
  −
*Continually measure technical readiness of the RobotX platform
      
== Primary Management Roles and Responsibilities ==
 
== Primary Management Roles and Responsibilities ==
 
===Requirements Management===
 
===Requirements Management===
Requirements are the foundation of the program and requirements management process helps ensure delivery of capability that meets intended mission performance objectives.<br>
+
'''Requirements''' are the foundation of the project and requirements management process helps ensure delivery of capability that meets intended mission performance objectives.<br>
Performance objectives are identified in operational terms at the system level during implementation of the Requirements Definition and Requirements Analysis processes.<br>
+
Performance objectives are identified in operational terms at the system level during implementation of the '''Requirements''' Definition and '''Requirements''' Analysis processes.<br>
 
The Subsystems Integrator has these '''Requirements Management''' responsibilities:
 
The Subsystems Integrator has these '''Requirements Management''' responsibilities:
*maintain a current and approved set of requirements
+
*maintain a current and approved set of '''Requirements'''
*thoughtful analysis and management of requirements insuring for system sustainability
+
*thoughtful analysis and management of '''Requirements''' insuring for subsystem integration and system performance
*synchronization with the program’s Configuration Management process to mitigate unintended or unanticipated consequences due to change
+
*synchronization with the program’s Configuration Management process to mitigate unintended consequences due to project change
 
*rigorous documentation of changes to the system performance specification
 
*rigorous documentation of changes to the system performance specification
    
===Process Responsibilities===
 
===Process Responsibilities===
*tracks requirements changes and maintains traceability of the system performance specification and delivered capability
+
*tracks '''Requirements''' changes and maintains traceability of the system performance specification and capabilities
*traces the high-level requirements down to the system elements through the lowest level of the design as the system design evolves to lower levels of detail
+
*traces the high-level '''Requirements''' down to the system elements through the lowest level of the design as the system design evolves to lower levels of detail
*establishes and maintains a Requirements Traceability Matrix (RTM)
+
*establishes and maintains a '''Requirements''' Traceability Matrix (RTM)
*#capturing all requirements in the system performance specification
+
*#capturing all '''Requirements''' in the system performance specification
 
*#documenting their decomposition/derivation and allocation history
 
*#documenting their decomposition/derivation and allocation history
 
*#document rationale for all entries and changes
 
*#document rationale for all entries and changes
*work with PM to track cost, schedule, and performance impacts associated with requirement changes and/or growth
+
*work with Project Management Team to track cost, schedule, and performance impacts associated with '''Requirements''' changes
    
===Risk Management===
 
===Risk Management===
Line 98: Line 100:  
**performance
 
**performance
 
**physical
 
**physical
*consists of interrelated functions that maintain consistency between product configuration information
+
*consists of interrelated functions that maintain consistency between project configuration information
#Personnel
   
#Responsibilities and Resources  
 
#Responsibilities and Resources  
#Training requirements
   
#Administrative meeting guidelines including a definition of procedures and tools  
 
#Administrative meeting guidelines including a definition of procedures and tools  
 
#Baselining processes  
 
#Baselining processes  
 
#Configuration control and Configuration status accounting  
 
#Configuration control and Configuration status accounting  
#Naming conventions  
+
#Naming conventions
 
#Audits and Reviews  
 
#Audits and Reviews  
 
#Configuration Identification  
 
#Configuration Identification  
 
#Configuration Change Management  
 
#Configuration Change Management  
#Configuration Status Accounting  
+
#Configuration Status Accounting
#Configuration Verification and Audit
      
===Interface Management===
 
===Interface Management===
 
*careful interface documentation ensures proper '''function''' and '''interoperability'''
 
*careful interface documentation ensures proper '''function''' and '''interoperability'''
 
*ensures that all the development teams document all internal and external interface requirements
 
*ensures that all the development teams document all internal and external interface requirements
*documents Requirements changes in accordance with the Configuration Management Plan
+
*documents '''Requirements''' changes in accordance with the Configuration Management Plan
 
*communicates interface information to team counterparts responsible for affected systems and system elements
 
*communicates interface information to team counterparts responsible for affected systems and system elements
 
*drives coherent testing to verify expected performance and eventually operational performance
 
*drives coherent testing to verify expected performance and eventually operational performance