*as knowledge of the system and system elements becomes more defined during design activities, verifiable lower-level requirements and interfaces are defined and refined
 
*as knowledge of the system and system elements becomes more defined during design activities, verifiable lower-level requirements and interfaces are defined and refined
 
*consider impacts of the originally defined capabilities and interfaces, and the overall system when defining and modifying interfaces
 
*consider impacts of the originally defined capabilities and interfaces, and the overall system when defining and modifying interfaces
  −
==Integration Plan==
  −
The PM and SE are responsible for planning, managing, and executing the Integration process.
  −
  −
Programs that develop an integration plan are more successful.
  −
  −
This plan defines the stages of integration, during which system elements are successively integrated to form higher level elements, and eventually the finished product.
  −
  −
The integration plan should include a description of the required  teams, test standards, testing methods, and integration schedule.
 