*The plan defines the stages of integration, during which system elements are successively integrated to form higher level elements, and eventually the finished RobotX platform.
 
*The plan defines the stages of integration, during which system elements are successively integrated to form higher level elements, and eventually the finished RobotX platform.
 
*The integration plan includes descriptions of the required teams, test standards, testing methods, and integration schedule.
 
*The integration plan includes descriptions of the required teams, test standards, testing methods, and integration schedule.
 +
 +
====Integrated Test Plan====
 +
*Includes design baseline evaluation
 +
*# critical design parameters
 +
*# performance threshholds
 +
*individual Subsystems test plans
 +
*# suitability tests
 +
*# effectiveness tests
 +
*platform performance test plan
 +
*# MOE (measures of effectiveness)
 +
*#* maximum operational time
 +
*#* operational goal accomplishment
 +
*# MOS (measures of suitability)
 +
*#*subsystem Interoperability
 +
*#*mean time between operational failure
    