===Process Responsibilities===
 
===Process Responsibilities===
*tracks requirements changes and maintains traceability of the system performance specification and delivered capability
+
*tracks '''Requirements''' changes and maintains traceability of the system performance specification and capabilities
*traces the high-level requirements down to the system elements through the lowest level of the design as the system design evolves to lower levels of detail
+
*traces the high-level '''Requirements''' down to the system elements through the lowest level of the design as the system design evolves to lower levels of detail
*establishes and maintains a Requirements Traceability Matrix (RTM)
+
*establishes and maintains a '''Requirements''' Traceability Matrix (RTM)
*#capturing all requirements in the system performance specification
+
*#capturing all '''Requirements''' in the system performance specification
 
*#documenting their decomposition/derivation and allocation history
 
*#documenting their decomposition/derivation and allocation history
 
*#document rationale for all entries and changes
 
*#document rationale for all entries and changes
*work with PM to track cost, schedule, and performance impacts associated with requirement changes and/or growth
+
*work with Project Management Team to track cost, schedule, and performance impacts associated with '''Requirements''' changes
    
===Risk Management===
 