Changes

70 bytes added ,  19:30, 15 May 2020
m
Line 17: Line 17:  
*Work Breakdown Structure (WBS)
 
*Work Breakdown Structure (WBS)
 
*Machining instructions  
 
*Machining instructions  
*Test cases
+
*Test procedures and Test Results
*Schedules
+
*Schedules: Developement, Design, Building, Test, Integrate
    
==OCRobotX Team Responsibilities in the Digital Ecosystem==
 
==OCRobotX Team Responsibilities in the Digital Ecosystem==
4,000

edits